Recovery and reinstallation of Ocean Installer mooring lines

Scope of works:

The Aquatic and JFO Alliance completed its first global collaboration project for Ocean Installer. The
project scope included the recovery and reinstallation of mooring lines on a production in ultra-deepwater.

Scope of supply:

Aquatic

  • 80Te powered reel winch with a track system for multi-reel lay
  • 20Te tensioner for handling the mooring lines
  • Four technicians

James Fisher Offshore

  • 100Te subsea winch for critical lifting operations
  • 30Te and two 20Te deck winches for deck handling operations
  • Two technicians

The partnership provided a full back deck solution and equipment spread which delivered significant cost
savings and minimised interfaces for the client.

PDF (1).png Download 'Recovery and installation of Ocean Installer mooring lines' case study.